astroturf.dev
OPERATIONSDocuments
OPERATIONS · DOCUMENTS

Delivery Document Vault

SOPs, safety packets, vendor contracts, COIs, daily logs, punch lists, closeout packages, GMAX certificates.
01SOPs + Safety
SOP
Install SOP v5.1 — base prep through striping
13 phases · annotated
Mar 14
SAFETY
Site safety packet — OSHA compliance kit
Required at every job mobilization
Feb 02
SAFETY
Heat illness prevention plan (TX/FL)
Crew-facing
Apr 18
SOP
Daily log standard — what foremen capture
Mar 08
SOP
Punch list close protocol
Mar 08
02Vendor + Insurance
VENDOR
Hellas backing supplier — MSA + COI
Renewed Jan 2026
Jan 14
VENDOR
SBR infill supplier — MSA
Jan 14
INSURANCE
General liability COI · 2026
Jan 02
INSURANCE
GMAX warranty insurance binder
Jan 02
03Active Job Artifacts
DAILY LOG
#2811 Allen Eagle Stadium — May 06
Foreman: Marcus T. · 12 photos
May 06
PUNCH
#2819 Prosper ISD — punch list (4 open)
May 06
CO
#2814 Plano West HS — change order #2 (pending sig)
+$48,200 · +5 days
May 04
PERMIT
#2812 Coppell MS — drainage permit (approved)
Apr 28
04Closeout Packages
CLOSEOUT
#2784 Lawrenceville School — final package
GMAX cert + warranty + as-built + lien releases
Mar 02
CLOSEOUT
#2776 Western Michigan U practice — final
Feb 14
GMAX
GMAX certification — Coppell HS Stadium
First-year test · 87 (target <165)
Aug 18